Роскошные апартаменты на берегу моря, Нет комиссии от покупателя, Luxury apartments on the beach, no commission from the buyer
1 850 000 EUR

Wind Park 2 000 kW

Contact An Agent

Wind park commissioned 4 wind turbines with a total installed capacity of 2 MW and expansion totaling 21 MW. 1 950 000/ 340 992 = 5,7 + 10% profit tax = 6.2 years investment is paid income excluding VAT 07.2012-06.2013 – 340 992 EUR Possible financing bank to 50%! Personal involvement of 50%! I. Land 152,905 m2: 1. 42,631 m2 2. 6931 m2 3. 17,388 m2 4. 44,637 m2 5. 41,318 m2 II. Wind Turbines – 4 pcs. at 500 kilowatts – working with supporting infrastructure III. DDP / development plan / – 4. visas for designing new 7 pc. wind power up to 3000 kilowatts each. Important! Ground outside the PUP is the status of agricultural high category. Priority will be leased. Additional revenue of about 10 000 lev per year. The company ‘s scope of work construction and operation of facilities for the production of electricity and / or heat energy from conventional and renewable sources , production and sale of electricity and / or heat of conventional and renewable energy, development and implementation of other investment projects country and abroad, as any other business and / or services that are not prohibited by law. The Company’s operation of a wind farm Mogilishte – North, located in the village of Kavarna Municipality. Wind farm ‘ North ” consists of four pieces of 500 kW wind turbines each with a total installed capacity of two megawatts / 2 MW /, on our own land with an area of 11.587 acres. Generators are second-hand , recycled in Germany, with the following technical parameters: generator 1 Model Vestas V39/500, power 500 kW, 39 m rotor diameter , 40 meters high tower. generator 2 Model NTK 500/41/50, power 500 kW, 41 m rotor diameter , 50 meters high tower. generator 3 Model NTK 500/41/50, power 500 kW, 41 m rotor diameter , 50 meters high tower. 4 generator Model Vestas V39/500, power 500 kW, 39 m rotor diameter , 40 meters high tower. To operate the generators are also used : transformer – 4 , three-phase power transformer – 3 , switchgear , GRU , dashboard subsistence panel metering, pillar , cable lines . Mode of operation : At the base of the tower of the wind turbine is a control panel with a computer that monitors the behavior of the generator , the parameters of the energy system , wind parameters and manages generatova . Mode is fully automatic. At wind speeds below 4 m / s. computer off the generator and locked rotor. At wind speeds greater than 25 m / sec. is actuated braking system . The wind farm is connected to the distribution network 20 kV, substation ” Kavarna ” to airline ” Krupen .” Metering of electricity is carried out on side 20 kV to 20 kV switchgear with existing electronic meters / buy-sell / bi-directional active and reactive power . Capturing data from meters is carried out in the presence of representatives of the company and electricity company . Expansion of the wind farm is carried out in the company’s own land . Obtained capacity of the distribution network , amounting to 12 MW, which signed a preliminary agreement to join a producer with the electricity company E.ON. Turbines to be built will be connected to the substation ” Varna”, cable line connecting points of raising turbine substation . Our company achieved sales in the project ” North” committed to provide the design of the wind park , to obtain all necessary permits or approvals to permit, to provide the necessary assistance to the investor in the supply and installation of other wind and assist in all possible ways of inserting the object into operation , the actual connection of the expansion of the park to the grid and begin generating electricity .

Contact An Agent