Роскошные апартаменты на берегу моря, Нет комиссии от покупателя, Luxury apartments on the beach, no commission from the buyer
18 900 000 EUR

Water Power Plant

Contact An Agent

High-pressure HPP.

Power-3700Kwa.

Tube length -500.m. – F / 1200mm.

Tunel – 2 811m. – (2.60m. X 2.80m.)

Dam (height) – 28.5m (massive construction)

Water drop – 154m.

Water quantity m3/sek -3.200.

Turbines 1 pc. (3700kwa.) Francis type             -Manufacturer Bulgaria

Generator – synchronous, power – 3700kw      -Manufacturer Germany

Annual production (estimated) – 14 370 000kw

Purchase price – 0.26 lev / kw WAT

Water rights to 2019

Custom operators – 3

Completion date – 11.2012, the

Contact An Agent