Production property of 2500 sq.m. – VEGETABLES AND FRUIT PROCESSING AND DRIED CEREALS
OWN PLACE – flat land, fully landscaped with gardens and landscaping. Built-in fence from LT panel on concrete basement. The site is with local sewerage, electricity supply and septic tank. The water supply is from a local water supply network.
MANUFACTURING BUILDING – TABLES FOR PROCESSING AND DRIED FRUIT AND VEGETABLES WITH BUILDING AREA 545.40sq.m.
The building is a modern construction, completed in 2016, made of 30k18m double-walled steel structure, sandwich roof and fence panels and partly made massive walls for the residential part.
Finishing is a modern standard covering all modern requirements: sub-hygienic flooring for the main production workshop, smooth cement flooring for the other working and storage areas and terracotta for the administrative and household part.
The distribution of the building includes:
working room / workshop 143sq.m.,
Warehouse 165sq.m.
Packaging 63sq.m.,
Dryer 54sq.m.,
Boiler and administrative-bit part.
In the drying room are built two drying rooms, with two doors with a volume of 32 cubic meters.
Home section – rest room, men’s and women’s sanitary units with hygienic pass and showers
The office part is fully furnished.
All rooms have independent approaches from the yard.
The company has a built-in technological line for processing, cleaning, washing, drying, calibration and packing of the raw material, including:
- Fan washing machine
- Tape conveyor
- Dehumidifier 2 pieces
- Trasina Calibrator
- Water Blanchard
- Boiler system
- Drying chamber – 2 pcs
- Additional set of trays and trolleys
- Work equipment – work tables, electronic scales, printer, etc.
The plant is designed for a minimum of 15 workers in one-shift and three-shift operation – primary preparation, drying, processing and packaging.
We hold a certificate and certificates for the registration of a BCSA site for the production and processing of all types of fruits and vegetables (including frogs). A self-control system for HACCP has been implemented.
The property is located in a communicative place – near Stara Zagora
The plant was completely finished and put into operation in 2016.
It is built on a European program, initially for the processing of dried prunes – own production.
Close to the factory / 600 meters is a garden of 60 decares of own plum plantations /.
There are about 500 decares of plum trees in the area of the enterprise.
After the limitation period for processing only own production (which was until 2017),
the plant is dedicated to the production and drying of all types of fruits and vegetables, including mushrooms.